Our Projects
Our projects are a testimony of our philosophy and approach. Visit the below links to see where we apply our knowledge and experience.
Completed Projects
Sterilizer System in Lemesos
Project: Installation of an ultraviolet (UV)
sterilizer system treating potable water
from the facilities
Location: Lemesos, Cyprus
Completion Year : 2010
Scope of Work: Site organization, supply of E-M equipment, installation,
testing, commissioning, start-up.
Capacity: 60 m3/hr
Description: Supply and installation
of a fully automated UV sterilizer
system ahead of the central potable
water booster system |
|
Sewage Treatment Plant in Lemesos
Project: Refurbishment of the Sewage
Treatment Plant(STP) treating the effluent
from the water park facilities
Location: Lemesos, Cyprus
Completion Year : 2010
Scope of Work: Design, site organization, supply of E-M equipment, installation, testing, commissioning and start-up
Capacity: 150 m3/day
Organic Loading: 46 kgBOD5 /day
Population Equivalent: 762 people
Description: Refurbishment of
tertiary double multilayer sand filters
and carbon filters with filter media,
pilot valves and PLF controls. Supply
and installation of new filter feed
pumps and chemical dosing systems
Construction of new control panel for
the STP.
Repair of air blower systems.
Operation and maintenance. |
|
Sewage Treatment Plant in Mandria, Paphos
Project: Construction of a new Sewage
Treatment Plant (STP) treating the effluent
from a housing development
Location: Mandria, Cyprus
Completion Year : 2009
Scope of Work: Site organization, supply of E-M equipment, installation, testing, commissioning, start-up, operation and maintenance
Capacity: 160 m3/day
Organic Loading: 50 kgBOD5 /day
Population Equivalent: 800 people
Description: Tertiary treatment sewage
treatment plant achieved with the extended
aeration activated sludge process and
multilayer sand filtration. The treated effluent is
fit for unrestricted irrigation. |
|
Wastewater Treatment Plant in Lemesos
Project: Dissolved Air Flotation Unit
Location: Lemesos, Cyprus
Completion Year: 2008
Scope of Work: Site organization, installation,
testing, start-up and integration with existing
WWTP process.
Capacity: 60 m3/hr
Organic Loading: 1,500 kgBOD5 /day
Population Equivalent: 25,000 people
Description: A new
circular dissolved air flotation
unit with chemical coagulation
and flocculation was installed
ahead of the biological process
to reduce the organic load to the
already overloaded secondary
biological treatment. |
|
 |
Wastewater Treatment Plant in Lemesos
Project: Refurbishment and upgrade
of the Wastewater Treatment Plant (WWTP)
treating the effluent from the factory
Location: Lemesos, Cyprus
Completion Year: 2009
Scope of Work: Site organization, supply of E-M equipment, installation, testing, commissioning, start-up, operation and maintenance
Capacity: 80 m3/day
Organic Loading: 200 kgBOD5 /day
Population Equivalent: 3,500 people
Description: Installation of a tertiary treatment
pressure filtration system and the replacement
of the aeration elements in the biological tanks |
|
Sewage Treatment Plant in Chloraka, Paphos
Project: Refurbishment of the
Sewage Treatment Plant (STP)
treating the effluent from the
holiday apartments
Location: Chloraka, Cyprus
Completion Year: 2009
Scope of Work: Site organization,
supply of E-M equipment, installation,
testing, commissioning and start-up
Capacity: 80 m3/day
Organic Loading: 25 kgBOD5 /day
Population Equivalent: 400 people
Description: Replacement of the
aeration elements in the biological
tanks and sedimentation system.
Repairs on the pumping, sludge
and chlorination system |
|
Sewage Treatment Plant in Chloraka, Paphos
Project: Refurbishment of the
Sewage Treatment Plant (STP)
treating the effluent from the
holiday apartments
Location: Chloraka, Cyprus
Completion Year: 2009
Scope of Work: Site organization,
additional civil works, supply of E-M
equipment, installation, testing,
commissioning and start-up
Capacity: 50 m3/day
Organic Loading: 15 kgBOD5 /day
Population Equivalent: 250 people
Description: Replacement of
pumping, sedimentation, sludge
and chlorination system. Installation
of new blowers and aeration
elements in the biological tanks |
|
Wastewater Treatment Plant in Kosi, Larnaca
Project: New Larnaca-Ammohostou landfill
Leachate wastewater treatment plant
Project Details : Construction of a new
Wastewater Treatment Plant (WWTP)
treating the leachate from the new Larnaca-Amohostou landfill
Location: Kosi Larnaca, Cyprus
Completion Year : 2009
Scope of Work: Site organization, E/M installation (excluding RO), testing, commissioning and start-up
Capacity: 200 m3/day
Organic Loading: 7,422 kgCOD /day
Population Equivalent: 73,633 people
Description: Primary and secondary
treatment followed by reverse osmosis
making the treated water fit for unrestricted
irrigation |
|
Sewage Treatment Plant in Prodromi, Paphos
Project: Construction of a new
Sewage Treatment Plant (STP)
treating the effluent from the a
housing development
Location: Prodromi Paphos, Cyprus
Completion Year : 2010
Scope of Work: E/M design, site organization, supply of E-M equipment, installation, testing, commissioning and start-up
Capacity: 50 m3/day
Organic Loading: 15 kgBOD5 /day
Population Equivalent: 250 people
Description: Secondary treatment sewage treatment plant achieved with the extended aeration activated sludge process followed by disinfection.
|
|
Sewage Treatment Plant in Anglisides, Larnaca
Client: Ministry of Agriculture, Natural Resources & Environment
Water Development Department
Location: Agglisides, Cyprus
Project: Refurbishment of sewage treatment plant
and pumping station and operation and maintenance
for one (1) year
Completion Year: Phase 1 (Refurbishment): 2010
Phase 2 (Operation & Maintenance): 2011
Scope of Work: Final design, site organization, supply of E-M equipment,
installation, testing, commissioning, start-up and operation and maintenance
Capacity: 90 m3/hr
Organic Loading: 58.5 kgBOD5 /day
Population Equivalent: 975 people
Description: Tertiary treatment sewage treatment plant achieved with the
extended aeration activated sludge process and multilayer sand filtration.
The treated effluent is fit for unrestricted irrigation.
|
|
|
Projects Under Construction
Sewage Treatment Plant, prefabricated
Project: Construction of a new prefabricated Sewage Treatment Plant (STP)
treating the effluent from the housing development
Completion Year: 2011
Scope of Work: Design, site organization, supply of E-M equipment,
installation, testing, commissioning and start-up
Capacity: 40 m3/day
Organic Loading: 15 kgBOD5 /day
Population Equivalent: 250 people
Description: Secondary treatment sewage treatment plant and pumping
stations. Treated effluent achieved with the extended aeration activated
sludge process followed by disinfection.
|
|
Sewage Treatment Plant in Argaka, Paphos
Project: Construction of a new
Sewage Treatment Plant (STP)
treating the effluent from the a
housing development
Location: Argaka Paphos, Cyprus
Completion Year : 2011
Scope of Work: E/M design, site organization, supply of E-M equipment, installation, testing, commissioning and start-up
Capacity: 30 m3/day
Organic Loading: 9 kgBOD5 /day
Population Equivalent: 150 people
Description: Secondary treatment sewage
treatment plant achieved with the extended
aeration activated sludge process followed by
disinfection.
|
|
Sewage Treatment Plant in Pissouri, Lemesos
Project: Construction of a new
Sewage Treatment Plant (STP) treating the effluent from a housing development
Location: Pissouri, Cyprus
Completion Year : 2011
Scope of Work: Design, site
organization, supply of E-M equipment,
installation, testing, commissioning
and start-up
Capacity: 40 m3/day
Organic Loading: 12 kgBOD5 /day
Population Equivalent: 200 people
Description: Secondary treatment sewage
treatment plant achieved with the extended
aeration activated sludge process followed by
disinfection. |
|
Sewage Treatment Plant in Tremythousa, Paphos
Project: Construction of a new
Sewage Treatment Plant (STP)
treating the effluent from a
housing development
Location: Tremythousa Paphos, Cyprus
Completion Year : 2011
Scope of Work: Design, site
organization, supply of E-M equipment,
installation, testing, commissioning
and start-up
Capacity: 250 m3/day
Organic Loading: 80 kgBOD5 /day
Population Equivalent: 1300 people
Description: Tertiary treatment sewage
treatment plant achieved with the extended
aeration activated sludge process and
multilayer sand filtration. The treated effluent is
fit for unrestricted irrigation.
|
|
Membrane Bioreactor sewage treatment plant, prefabricated
Project: Construction of a new prefabricated Membrane Bioreactor (MBR)
Sewage Treatment Plant (STP) treating the effluent from the housing development
Completion Year: 2011
Scope of Work: Design, site organization, supply of E-M equipment,
installation, testing, commissioning and start-up
Capacity: 25 m3/day
Organic Loading: 10 kgBOD5 /day
Population Equivalent: 160 people
Description: Tertiary treatment sewage treatment plant achieved
with the Membrane Bioreactor (MBR) and activated sludge process.
The treated effluent is fit for unrestricted irrigation and toilet flushing.
|
|
|
|
|
|